Skip to product information
1 of 10

Weisshorn Sleeping Bag Single 213cm Thermal Camping Hiking Pink

Weisshorn Sleeping Bag Single 213cm Thermal Camping Hiking Pink

SKU:SB-S-CURVE-PK

Regular price $44.99
Regular price $82.99 Sale price $44.99
Sale Sold out
Shipping calculated at checkout.
Quantity

Experience year-round comfort with our premium 3-4 season sleeping bag, perfect for the Australian outdoors. With temperatures between -5 and 20 degrees, it ensures a cozy night's sleep from spring through to winter. Measuring a generous 213cm x 75cm, it offers plenty of room for adults to stretch out. The durable 190T polyester shell and soft-touch lining provide the perfect balance of warmth and breathability. Filled with 500gsm hollow fibre filling and lined with soft polyester pongee fabric, the sleeping bag is soft, lightweight and water-resistant. For added comfort, the two-way zipper at the bottom allows for easy foot ventilation, while the adjustable drawstring hood keeps you snug on chilly nights. Lightweight and highly portable, it packs down effortlessly into its compact carry bag—ideal for hiking and road trips. Planning a family adventure? We also stock the matching kids' version in our store so the whole family can stay cozy together! Durable, practical, and family-ready, it's the ultimate companion for your next camping getaway.

Features
500g/m² hollow fibre filling
Soft polyester pongee lining
Suitable for -5 degrees to 20 degrees
Lightweight
Water-resistant
Colourful design
Adjustable tightening strap
Secure closure velcro
Double opening zippers
Comes with a carry bag

Specifications:
Color: Pink
Material: 190T polyester ripstop
Filling: 500gsm hollow fibre
Lining: 190T polyester pongee
Temperature range: -5 degrees to -20 degrees
Comfort rating: 10 degrees
External dimensions: 213m (L) x75cm (W)
Packed dimensions: 27m (D) x45cm (H)
Weight: 2kg

Package Content
Single Sleeping Bag x 1
Carry bag x 1

This product comes with 1 year warranty

Shipping Restriction Notice

Shipments to the specific postcode-suburb combinations below are excluded. If you wish to proceed with orders to these zones with additional shipping costs, please reach out to us for assistance.

SB-S-CURVE-PKSB-S-CURVE-PK
View Complete List of Undeliverable Postcode Suburb Combinations
Postcode Suburb / Location
0803 WAGAIT BEACH
0811 CASUARINA
0813 KARAMA
0814 NIGHTCLIFF
0821 WINNELLIE
0822 ACACIA HILLS, ANGURUGU, ANINDILYAKWA, ANNIE RIVER, BATHURST ISLAND, BEES CREEK, BELYUEN, BLACK JUNGLE, BLACKMORE, BURRUNDIE, BYNOE, BYNOE HARBOUR, CAMP CREEK, CHANNEL ISLAND, CHARLES DARWIN, CHARLOTTE, CLARAVALE, COBOURG, COLLETT CREEK, COOMALIE CREEK, COX PENINSULA, DALY, DALY RIVER, DARWIN RIVER DAM, DELISSAVILLE, DOUGLAS-DALY, EAST ARM, EAST ARNHEM, ELRUNDIE, EVA VALLEY, FINNISS VALLEY, FLEMING, FLY CREEK, FREDS PASS, GALIWINKU, GLYDE POINT, GOULBURN ISLAND, GUNBALANYA, GUNN POINT, HAYES CREEK, HIDDEN VALLEY, HOTHAM, HUGHES, KAKADU, KOOLPINYAH, LAKE BENNETT, LAMBELLS LAGOON, LITCHFIELD PARK, LIVINGSTONE, LLOYD CREEK, MANDORAH, MANINGRIDA, MAPURU, MARANUNGA, MARGARET RIVER, MARRAKAI, MCMINNS LAGOON, MELVILLE ISLAND, MICKETT CREEK, MIDDLE POINT, MILIKAPITI, MILINGIMBI, MILYAKBURRA, MINJILANG, MOUNT BUNDEY, MURRUMUJUK, NAUIYU, NEMARLUK, NGANMARRIYANGA, NUMBULWAR, NUMBURINDI, OENPELLI, PEPPIMENARTI, PIRLANGIMPI, POINT STEPHENS, POINT STUART, PULARUMPI, RAKULA, RAMINGINING, ROBIN FALLS, RUM JUNGLE, SANDPALMS ROADHOUSE, SOUTHPORT, STAPLETON, THAMARRURR, TIPPERARY, TIVENDALE, TIWI ISLANDS, TORTILLA FLATS, TUMBLING WATERS, UMBAKUMBA, VERNON ISLANDS, WADEYE, WAGAIT BEACH, WAK WAK, WARRUWI, WEDDELL, WEST ARNHEM, WICKHAM, WINNELLIE, WISHART, WOOLANING, WURRUMIYANGA
0830 PALMERSTON CITY
0837 NOONAMAH
0838 BERRY SPRINGS
0839 COOLALINGA
0840 DUNDEE BEACH, DUNDEE DOWNS, DUNDEE FOREST
0845 BATCHELOR
0847 PINE CREEK
0850 COSSACK
0851 KATHERINE
0852 ARNOLD, BAINES, BARUNGA, BESWICK, BESWICK CREEK, BINJARI, BIRDUM, BRADSHAW, BUCHANAN, BULMAN WEEMOL, CRESWELL, DAGURAGU, DALY WATERS, DELAMERE, EDITH, ELSEY, FLORINA, FLYING FOX, GREGORY, GULUNG MARDRULK, GURINDJI, HELEN SPRINGS STATION, JILKMINGGAN, KALKARINDJI, KATHERINE, LAJAMANU, LARRIMAH, LIMMEN, MANBULLOO, MARANBOY, MATARANKA, MCARTHUR, MINIYERI, MINIYERI INTERNAL, NGUKURR, NITMILUK, PELLEW ISLANDS, PIGEON HOLE, ROBINSON RIVER, STURT PLATEAU, TANAMI EAST, TIMBER CREEK, TOP SPRINGS, URALLA, VENN, VICTORIA RIVER, VICTORIA RIVER DOWNS, WARUMUNGU, WAVE HILL, WILTON, YARRALIN
0853 TINDAL
0854 BORROLOOLA
0860 TENNANT CREEK
0861 TENNANT CREEK
0862 CALVERT, ELLIOTT, NEWCASTLE WATERS, NICHOLSON, PAMAYU, RENNER SPRINGS, TABLELANDS, TENNANT CREEK, WARREGO
0871 ALICE SPRINGS
0872 ALI CURUNG, ALICE SPRINGS, ANMATJERE, ENGAWALA, HAASTS BLUFF, HERMANNSBURG, MIMILI, SANDOVER, SANTA TERESA, TI TREE, YULARA
0873 AMOONGUNA, ARUMBERA, CONNELLAN, HEAVITREE GAP CPA, ILPARPA, ROSS
0880 GAPUWIYAK, GUNYANGARA, NHULUNBUY, YIRRKALA
0881 NHULUNBUY
0885 ALYANGULA
0886 JABIRU
1335 POTTS POINT
1499 SUTHERLAND
2139 CONCORD REPATRIATION HOSPITAL
2628 AVONSIDE
2630 ROSE VALLEY
2649 LAUREL HILL, NURENMERENMONG
2795 CLEAR CREEK
2898 LORD HOWE ISLAND
2899 NORFOLK ISLAND
3552 BENDIGO
3709 MOUNT ALFRED
4003 GEORGE STREET
4275 ILLINBAH
4304 BOOVAL FAIR
4306 BLACKBUTT SOUTH
4310 WOOLOOMAN
4313 LOWER CRESSBROOK, TOOGOOLAWAH
4340 ASHWELL
4343 LOWER TENTHILL
4350 CLIFFORD GARDENS
4352 CONDAMINE PLAINS, MOUNT LUKE, YANDILLA
4357 MILLMERRAN DOWNS
4359 WEST HALDON
4361 MANAPOURI
4370 MOUNT COLLIERY, NORTH BRANCH, WOMINA
4380 STORM KING, SUGARLOAF
4403 WEST PRAIRIE
4404 FORMARTIN
4406 HANNAFORD
4407 NANGWEE
4413 GREENSWAMP
4415 DALWOGON, KOWGURAN
4416 BARRAMORNIE
4417 NOORINDOO, OBERINA, PARKNOOK, SURAT, WARKON, WELLESLEY, WERIBONE
4419 BUNGABAN
4423 TEELBA
4424 DRILLHAM, DRILLHAM SOUTH, GLENAUBYN
4428 WALLUMBILLA NORTH
4454 ARCADIA VALLEY, BEILBA, HIGHLAND PLAINS, MOUNT HOWE, MOUNT HUTTON
4455 BALLAROO, BLYTHDALE, BUNGEWORGORAI, TINGUN
4462 AMBY
4467 MUNGALLALA
4468 MORVEN
4470 SOMMARIVA
4474 ADAVALE
4477 AUGATHELLA
4478 MINNIE DOWNS
4479 COOLADDI
4481 WINDORAH
4486 HEBEL
4487 BEGONIA
4492 THARGOMINDAH
4493 HUNGERFORD
4496 TALWOOD
4566 NOOSAVILLE
4580 COOLOOLA
4605 BYEE
4606 GREENVIEW
4610 IRONPOT
4611 MARSHLANDS
4612 KEYSLAND
4613 KINLEYMORE
4625 BRANCH CREEK, DIRNBIR
4630 GLENLEIGH, MONAL
4650 MOUNT URAH, WALKERS POINT
4660 GOODWOOD
4671 BOOLBOONDA
4676 LOWMEAD
4699 BAJOOL
4702 BOOLBURRA, GINDIE, JOSKELEIGH, KALAPA, TARRAMBA
4703 LAKE MARY
4705 LOTUS CREEK
4714 HORSE CREEK, LEYDENS HILL
4719 ISLA, LONESOME CREEK
4721 THERESA CREEK
4726 ARAMAC
4732 MUTTABURRA
4741 COPPABELLA, HAZLEDEAN, PINNACLE
4751 PLEYSTOWE
4757 BROKEN RIVER
4798 PINDI PINDI
4800 CRYSTAL BROOK
4806 FREDERICKSFIELD, GROPER CREEK, KIRKNIE, WANGARATTA
4807 ALVA, DALBEG
4813 TOWNSVILLE MILPO
4816 MUTARNEE, PALM ISLAND, SELLHEIM
4819 WEST POINT
4822 BELLFIELD, SAXBY, WOOLGAR
4823 JULIA CREEK
4824 THREE RIVERS
4825 KALKADOON
4828 CAMOOWEAL
4829 BEDOURIE
4830 BURKETOWN
4849 DAMPER CREEK
4850 TOOBANNA
4854 EAST FELUGA, FELUGA, MIDGENOO, MURRAY UPPER
4855 JAFFA
4856 JAPOONVALE, WALTER LEVER ESTATE
4859 NO. 6 BRANCH
4860 MIGHELL, MUNDOO
4861 BARTLE FRERE
4865 PACKERS CAMP
4871 ALOOMBA, BOOGAN, BRAMSTON BEACH, CROYDON, FORSAYTH, GEORGETOWN, GERMANTOWN, LAKELAND, MOUNT MOLLOY, MOUNT SURPRISE, WOOPEN CREEK, YARRABAH
4872 BARRINE, INNOT HOT SPRINGS
4873 BAMBOO, CAPE TRIBULATION, CASSOWARY, COW BAY, DAINTREE, FOREST CREEK, LOWER DAINTREE, WHYANBEEL
4874 EVANS LANDING, JARDINE RIVER, MAPOON, MISSION RIVER, NANUM, NAPRANUM, ROCKY POINT, SHELBURNE, TRUNDING, WEIPA, WEIPA AIRPORT, WENLOCK
4875 BADU ISLAND, BOIGU ISLAND, COCONUT ISLAND, DARNLEY ISLAND, DAUAN ISLAND, ERUB, ERUB ISLAND, HORN, HORN ISLAND, KUBIN VILLAGE, MABUIAG ISLAND, MASIG ISLAND, MER ISLAND, MOA ISLAND, MURRAY ISLAND, PORUMA ISLAND, PRINCE OF WALES, SAIBAI ISLAND, STEPHENS ISLAND, THURSDAY ISLAND, WARRABER ISLET, YAM ISLAND, YORKE ISLAND
4876 BAMAGA, INJINOO, NEW MAPOON, SEISIA, UMAGICO
4880 ARRIGA
4883 CARRINGTON, WONGABEL
4884 LAKE BARRINE
4885 BUTCHERS CREEK, GLEN ALLYN, KUREEN, NORTH JOHNSTONE
4886 BEATRICE, MILLAA MILLAA, MINBUN
4887 IRVINEBANK, MOOMIN, WATSONVILLE, WONDECLA
4888 EVELYN
4892 ABINGDON DOWNS, ARBOUIN, ARCHER RIVER, AURUKUN, BELLEVUE, COEN, DIXIE, EDWARD RIVER, GAMBOOLA, GROGANVILLE, GUNUNA, HIGHBURY, HOLROYD RIVER, KOWANYAMA, LAKEFIELD, LAURA, LIZARD, LOCKHART, LOCKHART RIVER, LYNDSIDE, MARAMIE, MOUNT MULGRAVE, PALMER, PORMPURAAW, RAVENSWORTH, RED RIVER, SOUTH WELLESLEY ISLANDS, STAATEN, WELLESLEY ISLANDS, WEST WELLESLEY ISLANDS, WROTHAM, YAGOONYA, YARRADEN
4895 AYTON, BLOOMFIELD, COOKTOWN, DEGARRA, HELENVALE, HOPE VALE, ROSSVILLE, STARCKE, WUJAL WUJAL
5221 AMERICAN RIVER
5223 CASSINI, CYGNET RIVER, DUNCAN, NEWLAND
5310 CALIPH, WANBI
5410 LINWOOD
5601 BACKY POINT, COWLEDS LANDING, CULTANA, DOUGLAS POINT, DOUGLAS POINT SOUTH, FALSE BAY, FITZGERALD BAY, IRON BARON, MULLAQUANA, MURNINNIE BEACH, POINT LOWLY, POINT LOWLY NORTH, PORT BONYTHON, WHYALLA BARSON
5653 YANINEE
5661 KOOLGERA, PIMBAACLA, WALLALA, WIRRULLA, YANTANABIE
5690 NULLARBOR
6161 ROTTNEST ISLAND
6220 UDUC
6221 WOKALUP
6225 CARDIFF
6231 BUNBURY
6236 PARADISE, WELLINGTON FOREST, WELLINGTON MILL
6239 THOMSON BROOK, YABBERUP
6258 RINGBARK
6260 CHANNYBEARUP, YEAGARUP
6262 BOORARA BROOK
6271 STIRLING ESTATE
6275 SCOTT RIVER EAST
6302 CALJIE, COLD HARBOUR
6304 DALE
6306 JELCOBINE
6311 COMMODINE, CONTINE, CUBALLING, DRYANDRA, LOL GRAY, TOWNSENDALE, WARDERING, YORNANING
6312 DUMBERNING
6315 WEDGECARRUP
6316 KENMARE, WESTWOOD
6317 COBLININE, EWLYAMARTUP, MOOJEBING, MURDONG, PINWERNYING
6328 GREEN RANGE
6330 GOODE BEACH, KRONKUP, LOWLANDS
6332 ALBANY PO
6333 TINGLEDALE
6337 FITZGERALD, GAIRDNER, JACUP, JERRAMUNGUP, WEST FITZGERALD
6338 AMELUP, BORDEN, BOXWOOD HILL, BREMER BAY, MAGITUP, MONJEBUP, NALYERLUP, NORTH STIRLINGS, STIRLING RANGE NATIONAL PARK
6341 NYABING
6348 HOPETOUN
6352 NORTH KUKERIN
6355 SOUTH NEWDEGATE
6356 LAKE KING
6357 PINGARING
6359 HYDEN
6367 KONDININ
6383 CUBBINE
6397 ROCKY GULLY
6401 MURESK, ROSSMORE
6410 MOUNT CAROLINE, NORTH KELLERBERRIN
6412 NORTH BAANDEE
6414 NANGEENAN
6422 WALGOOLAN
6423 BOODAROCKIN, CARRABIN, WARRACHUPPIN, WESTONIA
6424 SOUTH BODALLIN
6431 BOORARA, BROWN HILL, BULONG, EMU FLAT, FEYSVILLE, KANOWNA, KOOKYNIE, KURNALPI, LAKEWOOD, ORA BANDA, PLUMRIDGE LAKES, TRAFALGAR, WARBURTON
6434 CUNDEELEE, FORREST, PARKESTON, RAWLINNA, ZANTHUS
6436 MENZIES, ULARRING
6437 LEINSTER
6438 LAKE DARLOT, LEONORA
6442 KAMBALDA EAST, KAMBALDA WEST
6443 BALLADONIA, CAIGUNA, COCKLEBIDDY, DUNDAS, EUCLA, FRASER RANGE, HIGGINSVILLE, MADURA, MUNDRABILLA, NORSEMAN, WIDGIEMOOLTHA
6445 NORTH CASCADE, SALMON GUMS
6446 GRASS PATCH
6448 GIBSON
6450 BEAUMONT, CONDINGUP, MERIVALE, MYRUP
6461 KOOMBERKINE
6472 BEACON
6473 NORTH WIALKI, WIALKI
6475 BOORALAMING
6479 MUKINBUDIN, WILGOYNE
6485 KORRELOCKING
6503 BAMBUN
6506 MOGUMBER
6509 GLENTROMIE, NEW NORCIA, WADDINGTON, YARAWINDAH
6515 WADDY FOREST
6519 WOMARDEN
6522 BUNDANOON, MINGENEW
6525 IRWIN, MOUNT ADAMS, YARDARINO
6531 GERALDTON PO
6532 BULLER
6535 ALMA, BOWES, EAST BOWES, GREGORY, HORROCKS, ISSEKA, NORTHAMPTON, OGILVIE, SANDY GULLY, YALLABATHARRA
6536 KALBARRI, KALBARRI NATIONAL PARK, ZUYTDORP
6562 COPLEY
6566 BEJOORDING
6568 WATTENING
6572 PIAWANING
6575 MILING
6603 MOCARDY
6605 KONDUT
6616 LATHAM
6630 MULLEWA
6635 SOUTH MURCHISON, YALGOO
6638 MOUNT MAGNET
6639 SANDSTONE
6642 KUMARINA, MEEKATHARRA, PEAK HILL
6646 LAKE CARNEGIE, LITTLE SANDY DESERT, WILUNA
6705 EAST LYONS RIVER, GASCOYNE JUNCTION, GASCOYNE RIVER, WEST LYONS RIVER
6707 NORTH WEST CAPE
6714 GAP RIDGE
6718 ROEBOURNE
6722 SOUTH HEDLAND
6725 BILINGURR, BROOME, DAMPIER PENINSULA, DJUGUN, EIGHTY MILE BEACH, GINGERAH, LAGRANGE, MINYIRR, ROEBUCK, WATERBANK
6726 CABLE BEACH
6728 CAMBALLIN, DERBY, GEEGULLY CREEK, KIMBOLTON, KING LEOPOLD RANGES, MEDA, ST GEORGE RANGES, WILLARE
6740 DRYSDALE RIVER, KALUMBURU, MITCHELL PLATEAU, OOMBULGURRI, PRINCE REGENT RIVER, WYNDHAM
6743 KUNUNURRA
6753 JIGALONG
6758 NULLAGINE
6760 MARBLE BAR
6765 FITZROY CROSSING, MOUNT HARDMAN
6770 HALLS CREEK, MCBEATH, MUELLER RANGES, ORD RIVER, PURNULULU, STURT CREEK, TANAMI
6798 CHRISTMAS ISLAND
6799 HOME ISLAND COCOS (KEELING) ISLANDS, WEST ISLAND COCOS (KEELING) ISLANDS
6903 LEEDERVILLE
6957 PALMYRA
6991 KELMSCOTT
6997 KELMSCOTT DC
7054 FERN TREE, LOWER SNUG
7109 CRADOC
7116 BROOKS BAY, CAIRNS BAY
7120 LEVENDALE, PARATTAH
7140 MALBINA
7170 ROCHES BEACH
7172 NUGENT
7175 MARION BAY
7211 CLEVELAND
7213 ROSSARDEN
7215 CHAIN OF LAGOONS
7255 BLUE ROCKS, LEEKA, LOCCOTA, MEMANA, PALANA, RANGA
7256 BUNGAREE, CURRIE, EGG LAGOON, GRASSY, LOORANA, LYMWOOD, NARACOOPA, NUGARA, PEARSHAPE, PEGARAH, REEKARA, SEA ELEPHANT, SURPRISE BAY, WICKHAM, YAMBACOONA, YARRA CREEK
7257 CAPE BARREN ISLAND
7304 CAVESIDE
7315 SPALFORD
7330 ARTHUR RIVER, BROADMEADOWS, NABAGEENA, ROGER RIVER, SCOPUS, WOOLNORTH
View full details